• Home
  • About us
  • Services
  • Projects
  • Inforoom
  • Courses
  • Events
  • Become a Partner
Contact Us
  • Rajkot, Gujarat, India 360001
  • info@adroitcorporation.in
  • +91 7203010101
Twitter Facebook-f Linkedin-in Youtube
  • Home
  • About us
  • Services
  • Projects
  • Inforoom
  • Courses
  • Events
  • Become a Partner
CONTACT US
  • Home
  • About us
  • Services
  • Projects
  • Inforoom
  • Courses
  • Events
  • Become a Partner
  • Home
  • About us
  • Services
  • Projects
  • Inforoom
  • Courses
  • Events
  • Become a Partner
Subsidy for CBG Plant in Maharashtra – Complete Guide (PSI-2019)
Home Bio Energy Subsidy for CBG Plant in Maharashtra – Complete Guide (PSI-2019)
January 08Bio Energy, Bio Fuel, Biofuels & Green Energy, CBG Plant, Interest Subsidy, Renewable Energy, Subsidy in Maharashtra
3312 Views

Subsidy for CBG Plant in Maharashtra – Complete Guide (PSI-2019)

Subsidy for CBG Plant in Maharashtra – Complete Guide (PSI-2019)

India is rapidly embracing renewable energy, and CBG Plants (Compressed Biogas Plants) have become the backbone of the nation’s clean energy ecosystem. Maharashtra, being one of the largest agricultural and industrial states, offers massive financial incentives for setting up a CBG Plant under the Package Scheme of Incentives 2019 (PSI-2019).

If you are planning to set up a CBG Plant in Maharashtra, this is the most complete, policy-accurate and updated subsidy guide based on the official PSI-2019 documents and taluka classifications.


1️⃣ Why Maharashtra Is the Best State for Setting Up a CBG Plant?

Maharashtra provides one of India’s highest subsidy structures for renewable energy.

CBG Plants fall under “Green Energy / Biofuel Production” – a Thrust Sector (Para 2.3)

Which means:
✔ 20% extra subsidy over standard limits
✔ 2 additional years of eligibility
✔ Highest benefits in backward regions (D, D+, Naxal, No-Industry districts)
✔ Subsidy up to 100% of Eligible Fixed Capital Investment (FCI)

If your goal is a profitable, long-term CBG Plant, Maharashtra is one of the best destinations.


2️⃣ Eligibility for CBG Plant Subsidy in Maharashtra

Your CBG Plant can qualify under:

A. MSME CBG Plant

If FCI ≤ ₹50 crore

B. LSI / Special LSI CBG Plant

If FCI > ₹50 crore and meets criteria in Table-1

C. Mega or Ultra-Mega CBG Plants

Based on FCI or employment (Table-2)

All categories get incentives – MSME being the most lucrative in backward talukas.


3️⃣ Location-Based Subsidy: Where Your CBG Plant Gets Maximum Benefit

Maharashtra talukas are classified as:

  • A – Highly developed

  • B – Developed

  • C – Less developed

  • D – Backward

  • D+ – Most backward

  • No-Industry Districts – (Hingoli, Gadchiroli)

  • Naxal-Affected Areas – (Gadchiroli, Chandrapur, Gondia, Yavatmal etc.)

Best subsidy regions for CBG Plants:

⭐⭐⭐⭐⭐ 100% Subsidy Zones

  • Gadchiroli

  • Hingoli

  • Washim (Aspirational)

  • Nandurbar (Aspirational)

  • Chandrapur (Naxal)

  • Yavatmal (Naxal)

⭐⭐⭐⭐ 80% Subsidy Zones

  • Vidarbha

  • Marathwada

  • Ratnagiri

  • Sindhudurg

  • Dhule

⭐⭐⭐ 50–60% Subsidy Zones

  • D & D+ regions across major districts

This location advantage makes your CBG plant financially far more viable.


4️⃣ Subsidy Structure for CBG Plants Under MSME Category

MSME is the most attractive category for CBG plants.

4.1 Industrial Promotion Subsidy (IPS)

✔ 100% SGST Refund on sales within Maharashtra
✔ Claimed annually
✔ Adjusted against eligible FCI

4.2 Interest Subsidy

✔ Up to 5%
✔ Limited to the annual electricity bill amount

4.3 Electricity Duty Exemption

✔ Available in C, D, D+, No-Industry, Aspirational & Naxal areas
✔ For entire eligibility period

4.4 Stamp Duty Exemption

✔ 100% in C, D, D+, No-Industry, Naxal, Aspirational
✔ On land purchase, lease, and loan documentation

4.5 Power Tariff Subsidy

  • ₹1 per unit in backward / special regions

  • ₹0.50 per unit in other areas

  • For 3 years

4.6 Extra 20% Subsidy for CBG Plants (Thrust Sector Benefit)

Because CBG Plant = Green Energy sector.

✔ 20% extra subsidy on top of normal limits
✔ +2 years extra eligibility

Maximum subsidy cannot exceed 100% of FCI.


5️⃣ Subsidy for Large Scale CBG Plants (LSI / Special LSI)

Industrial Promotion Subsidy

  • 50% of SGST for LSI

  • 40% of SGST (Net) for Special LSI

Basket of incentives

Depending on taluka category: 25% – 100% of FCI

Locations with maximum subsidy:

  • Vidarbha

  • Marathwada

  • Ratnagiri

  • Sindhudurg

  • Dhule

  • No-Industry districts

  • Naxal areas


6️⃣ Mega & Ultra-Mega CBG Plant Subsidy

For large CBG projects (₹200 crore to ₹4000+ crore):

✔ Customizable subsidy package
✔ Extended eligibility
✔ Stamp Duty & Electricity Duty exemption
✔ SGST-linked subsidies
✔ Flexibility based on investment/employment

Approved by:

  • High Power Committee (HPC)

  • Cabinet Sub Committee


7️⃣ Maximum Subsidy Limits for CBG Plants (MSME)

LocationMax Subsidy of FCIEligibility Period
C30%7 years
D40%10 years
D+50%10 years
Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Dhule80%10 years
No-Industry / Naxal / Aspirational100%10 years
+ Extra for CBG Plants+20%+2 yrs

💡 Example:
If your CBG Plant is in D+ area → 50% + 20% = 70% subsidy
If in No-Industry District → Direct 100% subsidy


8️⃣ Eligible Fixed Capital Investment (FCI) for CBG Plants

Allowed:

✔ Land cost
✔ Civil construction
✔ Digester tanks, pipelines
✔ Biogas purification systems
✔ Compressors, bottling units
✔ CBG storage cylinders
✔ Weighbridge
✔ Testing & R&D facilities
✔ Machinery installation
✔ Pre-operative expenses (up to 10%)
✔ Know-how & technology fees (up to 10%)

Not Allowed:

❌ Vehicles
❌ Solar captive plants (for incentives)


9️⃣ Process to Apply for CBG Plant Subsidy (Step-by-Step)

Step 1 – Before Construction

  • Land possession

  • MPCB Consent to Establish

  • IEM/Udyam Registration

  • DPR for CBG Plant

  • Apply to Implementing Agency (DIC/JDI/Directorate)

Step 2 – After Commissioning

  • First sale bill

  • MPCB Consent to Operate

  • Apply for Eligibility Certificate (EC)

Step 3 – Annual Subsidy Claim

  • SGST paid proof

  • Electricity duty / bills

  • Bank interest certificate

  • Audited balance sheet

  • Production & sales data

Subsidy is disbursed year-on-year based on eligibility.


🔟 Best Locations to Set Up a CBG Plant in Maharashtra

Based on Subsidy + Feedstock Availability:

⭐⭐⭐⭐⭐ Top Recommended

  • Gadchiroli (100%) – forest biomass

  • Chandrapur (100%) – agriculture + biomass

  • Yavatmal (100%) – cattle dung + crop waste

  • Hingoli (100%) – sugarcane + paddy waste

  • Washim (100%) – paddy + agri waste

  • Nandurbar (100%) – tribal/agri economy

⭐⭐⭐⭐ Highly Profitable

  • Ratnagiri

  • Sindhudurg

  • Dhule

  • Buldhana

  • Beed

  • Osmanabad

These regions give maximum subsidy + abundant biomass/feedstock.


Conclusion: Why You Must Set Up a CBG Plant Under PSI-2019

Setting up a CBG Plant in Maharashtra under PSI-2019 gives you:

✔ Up to 100% capital subsidy
✔ 20% additional benefit (Thrust Sector)
✔ SGST Refund
✔ Stamp Duty exemption
✔ Electricity Duty exemption
✔ Interest & Power Tariff Subsidies
✔ Strong agricultural & biomass ecosystem
✔ Reduced payback period

This is one of the best subsidy frameworks in India for renewable energy entrepreneurs.


Need Expert Help for CBG Plant Subsidy?

Adroit Corporation offers:

✔ DPR for CBG Plants
✔ Bank Loan (Project Finance)
✔ End-to-end PSI-2019 Subsidy Consultancy
✔ CBG Plant Planning & Financial Viability
✔ Annual SGST Claim Filing Support

Contact:
📧 sales@adroitcorporation.in
📞 7203010101
🌐 www.adroitcorporation.in

User Avatar

Rajesh Savaniya

#RenewableEnergy Bio Fuel Biofuel BiogasIndia CBGInvestment CBGPlant CBGSubsidy CompressedBiogas goverment subsidy government subsidy GovernmentSchemes GreenEnergy Interest Subsidy subsidy for new business WasteToEnergy
Subsidy for Manufacturing Unit in Maharashtra – Complete Guide (PSI-2019)
Next

Subsidy for Manufacturing Unit in Maharashtra – Complete Guide (PSI-2019)

Prev

Pipeline Subsidy for CBG Plants under DPI Scheme for CBG–CGD Pipeline

Pipeline Subsidy for CBG Plants under DPI Scheme for CBG–CGD Pipeline
Recent Posts
  • GOBARdhan Scheme 2026: Government Approves ₹23,731 Crore National CBG Scheme | Complete Guide to CBG Subsidy, Pricing & Benefits
    GOBARdhan Scheme 2026: Government Approves ₹23,731 Crore National CBG Scheme | Complete Guide to CBG Subsidy, Pricing & Benefits
    August 6, 2026
  • Pipeline Subsidy for CBG Plants under DPI Scheme for CBG–CGD Pipeline
    Pipeline Subsidy for CBG Plants under DPI Scheme for CBG–CGD Pipeline
    January 8, 2026
  • Subsidy for CBG Plant in Maharashtra – Complete Guide (PSI-2019)
    Subsidy for CBG Plant in Maharashtra – Complete Guide (PSI-2019)
    January 8, 2026
  • Subsidy for Manufacturing Unit in Maharashtra – Complete Guide (PSI-2019)
    Subsidy for Manufacturing Unit in Maharashtra – Complete Guide (PSI-2019)
    January 8, 2026
  • Taluka wise Area Classification for Manufacturing Subsidies in Maharashtra – Updated PSI-2019 Guide
    Taluka wise Area Classification for Manufacturing Subsidies in Maharashtra – Updated PSI-2019 Guide
    January 8, 2026
Categories
  • Aatmanirbhar Gujarat Scheme
  • Amusement Park Subsidy
  • Bio Energy
  • Bio Fuel
  • Biofuels & Green Energy
  • Blog
  • Business
  • Capital Subsidy
  • CBG Plant
  • CEFPPC Scheme
  • Ethanol Production Plant
  • Food Processing Subsidy
  • Hotel Loan
  • Hotel Loan
  • Hotel Subsidy
  • Incentives
  • Interest Subsidy
  • Licenses
  • Loan
  • MOFPI Subsidy
  • Project Finance
  • Renewable Energy
  • Resort Loan
  • Resort Subsidy
  • Subsidy
  • Subsidy in Madhya Pradesh
  • Subsidy in Maharashtra
  • Subsidy in Rajasthan
  • Subsidy in Uttar Pradesh
  • Theme Park Subsidy
  • Tourism Policy
  • Tourism Projects
  • Uncategorized
  • Wellness Resort Subsidy

Sign up to get Latest Updates

It is a long established fact that a reader will be distracted by the.

    Adroit Corporation is pioneer service provider company in project finance and subsidy work in region.

    • 218 to 220, 2nd Floor, Cosmo Complex, Mahila Collage Circle, Kalavad Rd, Rajkot, Gujarat 360001
    • info@adroitcorporation.in
    • +91 7203010101
    Services
    In-Office Consultation On-Site Expert Visit Quick Expert Call Virtual Expert Session Project Report Preparation
    Quick Info
    About Us  Projects Inforoom Contact  Become a Partner
    Opening Hours
    Monday
    9.30 - 7.00
    Tuesday
    9.30 - 7.00
    Wednesday
    9.30 -7.00
    Thursday
    9.30 - 7.00
    Friday
    9.30 - 7.00
    Saturday
    9.30 - 7.00
    Sunday
    Closed

    © 2026 Adroit Corporation.

    Facebook Youtube Linkedin Twitter

    Privacy Policy