• Home
  • About us
  • Services
  • Projects
  • Inforoom
  • Courses
  • Events
  • Become a Partner
Contact Us
  • Rajkot, Gujarat, India 360001
  • info@adroitcorporation.in
  • +91 7203010101
Twitter Facebook-f Linkedin-in Youtube
  • Home
  • About us
  • Services
  • Projects
  • Inforoom
  • Courses
  • Events
  • Become a Partner
CONTACT US
  • Home
  • About us
  • Services
  • Projects
  • Inforoom
  • Courses
  • Events
  • Become a Partner
  • Home
  • About us
  • Services
  • Projects
  • Inforoom
  • Courses
  • Events
  • Become a Partner
Interest Subsidy for Solar and Renewable Power Plants (Captive Use) to MSMEs in Gujarat
Home Biofuels & Green Energy Interest Subsidy for Solar and Renewable Power Plants (Captive Use) to MSMEs in Gujarat
September 23Biofuels & Green Energy, Interest Subsidy, Subsidy
2684 Views

Interest Subsidy for Solar and Renewable Power Plants (Captive Use) to MSMEs in Gujarat

🌱 Go Green, Save Costs, Grow Faster!

Under the visionary Aatmanirbhar Gujarat Scheme for Assistance to MSMEs, the Government of Gujarat is supporting MSMEs that invest in Solar, Wind, Hydro, Hybrid, or other renewable energy plants for captive use.

By switching to renewable energy, MSMEs can lower their power costs significantly—and now, they can also benefit from a generous interest subsidy on their term loans for such installations.



✅ Who is Eligible?

  • Only manufacturing MSMEs registered in Gujarat (Micro, Small, or Medium Enterprises).

  • The unit must set up a new solar or renewable power plant for captive use within its own premises (or elsewhere in Gujarat).

  • This subsidy is available only once for renewable energy installation.

  • Units that have already availed this subsidy under an earlier scheme are not eligible again.

  • Service sector units are not eligible under this subsidy.



⚡ What Type of Power Plants Are Covered? 

Solar Power Subsidy for Gujarat MSMEs

Eligible renewable energy sources include:

  • ✅ Solar

  • ✅ Wind

  • ✅ Hydro

  • ✅ Hybrid

  • ✅ Other renewable energy technologies (approved by authorities)

These installations can be:

  • Rooftop solar systems, or

  • Ground-mounted plants

  • Captive desalination or renewable power generation plants for in-house use



💰 Subsidy Rates Based on Taluka Category

The interest subsidy is linked to the location of the manufacturing unit, not where the renewable plant is set up:

Taluka CategoryInterest SubsidyMax Amount (per annum)Duration
Category 1 Taluka7%₹35.00 Lakhs7 Years
Category 2 Taluka6%₹30.00 Lakhs6 Years
Category 3 & Municipal Areas5%₹25.00 Lakhs5 Years

📌 Final classification of Talukas is determined by the Government.



🎁 Additional 1% Interest Subsidy (If You Qualify)

An additional 1% interest subsidy is available in the following cases:

CategoryConditions
Women Entrepreneur100% ownership by women
Differently Abled100% ownership by differently abled entrepreneurs
Registered StartupRecognized by DPIIT (GoI) or Govt. of Gujarat in the manufacturing sector
Young EntrepreneurAge below 35 years at the time of term loan sanction, with 100% ownership

📌 Valid age proof required: School Leaving Certificate or Birth Certificate.



📝 Important Notes

  • Minimum 2% interest must always be borne by the MSME, even after accounting for Central and State subsidies.

  • If interest subsidy is also received from Government of India, the state subsidy will be limited so that the enterprise pays at least 2% net interest.

  • If the enterprise defaults (RBI: 90+ days overdue), the default period will be deducted from eligible subsidy duration.

  • Loan takeovers between banks will be handled based on actual principal outstanding or newly released term loan—whichever is lower.



🔄Expansion + Solar Project? You Get Both!

If an existing MSME goes for expansion and installs a renewable power plant, it can claim interest subsidy for both, separately.

📌 Example:

  • If your unit is in Category 3 Taluka, you will get:

    • 5% interest subsidy for expansion

    • 5% interest subsidy for renewable power plant installation

(As per the taluka category of the manufacturing unit.)



📑 Conditions for Claim

  • Valid insurance of machinery/building/shed is mandatory.

  • Maintain separate bank records or certificates if term loan is used for multiple projects.

  • Captive power plants must be used only by the same unit.

  • The subsidy is valid only for new installations of renewable plants.



🏁 Conclusion

With rising electricity costs and increasing pressure for sustainability, installing a captive renewable power plant is a smart business move. Gujarat’s Interest Subsidy Scheme for MSMEs makes this move even smarter—by reducing the burden of interest on term loans.

Whether you’re a young entrepreneur, a startup, or a seasoned MSME, this is your chance to go green and grow lean.

📞 Need Help?

For assistance with: Book Consultation

  • Project report preparation

  • Loan structuring

  • Application and claim submission

  • Government Subsidy

👉 Contact Adroit Corporation
📧 Email: sales@adroitcorporation.in
📞 Call: +91 7203010101 | +91 8734010101

User Avatar

Rajesh Savaniya

Interest Subsidy Interest Subsidy for Renewable Power Plant Interest Subsidy for Solar Plant Interest Subsidy Hydro Plant Interest Subsidy Wind Mill Solar Subsidy
How to Get Liquor Shop License FL-1 and FL-2 in Gujarat
Next

How to Get Liquor Shop License FL-1 and FL-2 in Gujarat

Prev

Government Subsidy for CBG Plants in Uttar Pradesh

Government Subsidy for CBG Plants in Uttar Pradesh
Recent Posts
  • GOBARdhan Scheme 2026: Government Approves ₹23,731 Crore National CBG Scheme | Complete Guide to CBG Subsidy, Pricing & Benefits
    GOBARdhan Scheme 2026: Government Approves ₹23,731 Crore National CBG Scheme | Complete Guide to CBG Subsidy, Pricing & Benefits
    August 6, 2026
  • Pipeline Subsidy for CBG Plants under DPI Scheme for CBG–CGD Pipeline
    Pipeline Subsidy for CBG Plants under DPI Scheme for CBG–CGD Pipeline
    January 8, 2026
  • Subsidy for CBG Plant in Maharashtra – Complete Guide (PSI-2019)
    Subsidy for CBG Plant in Maharashtra – Complete Guide (PSI-2019)
    January 8, 2026
  • Subsidy for Manufacturing Unit in Maharashtra – Complete Guide (PSI-2019)
    Subsidy for Manufacturing Unit in Maharashtra – Complete Guide (PSI-2019)
    January 8, 2026
  • Taluka wise Area Classification for Manufacturing Subsidies in Maharashtra – Updated PSI-2019 Guide
    Taluka wise Area Classification for Manufacturing Subsidies in Maharashtra – Updated PSI-2019 Guide
    January 8, 2026
Categories
  • Aatmanirbhar Gujarat Scheme
  • Amusement Park Subsidy
  • Bio Energy
  • Bio Fuel
  • Biofuels & Green Energy
  • Blog
  • Business
  • Capital Subsidy
  • CBG Plant
  • CEFPPC Scheme
  • Ethanol Production Plant
  • Food Processing Subsidy
  • Hotel Loan
  • Hotel Loan
  • Hotel Subsidy
  • Incentives
  • Interest Subsidy
  • Licenses
  • Loan
  • MOFPI Subsidy
  • Project Finance
  • Renewable Energy
  • Resort Loan
  • Resort Subsidy
  • Subsidy
  • Subsidy in Madhya Pradesh
  • Subsidy in Maharashtra
  • Subsidy in Rajasthan
  • Subsidy in Uttar Pradesh
  • Theme Park Subsidy
  • Tourism Policy
  • Tourism Projects
  • Uncategorized
  • Wellness Resort Subsidy

Sign up to get Latest Updates

It is a long established fact that a reader will be distracted by the.

    Adroit Corporation is pioneer service provider company in project finance and subsidy work in region.

    • 218 to 220, 2nd Floor, Cosmo Complex, Mahila Collage Circle, Kalavad Rd, Rajkot, Gujarat 360001
    • info@adroitcorporation.in
    • +91 7203010101
    Services
    In-Office Consultation On-Site Expert Visit Quick Expert Call Virtual Expert Session Project Report Preparation
    Quick Info
    About Us  Projects Inforoom Contact  Become a Partner
    Opening Hours
    Monday
    9.30 - 7.00
    Tuesday
    9.30 - 7.00
    Wednesday
    9.30 -7.00
    Thursday
    9.30 - 7.00
    Friday
    9.30 - 7.00
    Saturday
    9.30 - 7.00
    Sunday
    Closed

    © 2026 Adroit Corporation.

    Facebook Youtube Linkedin Twitter

    Privacy Policy