
Subsidy for CBG Plant in Maharashtra – Complete Guide (PSI-2019)
Subsidy for CBG Plant in Maharashtra – Complete Guide (PSI-2019)
India is rapidly embracing renewable energy, and CBG Plants (Compressed Biogas Plants) have become the backbone of the nation’s clean energy ecosystem. Maharashtra, being one of the largest agricultural and industrial states, offers massive financial incentives for setting up a CBG Plant under the Package Scheme of Incentives 2019 (PSI-2019).
If you are planning to set up a CBG Plant in Maharashtra, this is the most complete, policy-accurate and updated subsidy guide based on the official PSI-2019 documents and taluka classifications.
1️⃣ Why Maharashtra Is the Best State for Setting Up a CBG Plant?
Maharashtra provides one of India’s highest subsidy structures for renewable energy.
CBG Plants fall under “Green Energy / Biofuel Production” – a Thrust Sector (Para 2.3)
Which means:
✔ 20% extra subsidy over standard limits
✔ 2 additional years of eligibility
✔ Highest benefits in backward regions (D, D+, Naxal, No-Industry districts)
✔ Subsidy up to 100% of Eligible Fixed Capital Investment (FCI)
If your goal is a profitable, long-term CBG Plant, Maharashtra is one of the best destinations.
2️⃣ Eligibility for CBG Plant Subsidy in Maharashtra
Your CBG Plant can qualify under:
A. MSME CBG Plant
If FCI ≤ ₹50 crore
B. LSI / Special LSI CBG Plant
If FCI > ₹50 crore and meets criteria in Table-1
C. Mega or Ultra-Mega CBG Plants
Based on FCI or employment (Table-2)
All categories get incentives – MSME being the most lucrative in backward talukas.
3️⃣ Location-Based Subsidy: Where Your CBG Plant Gets Maximum Benefit
Maharashtra talukas are classified as:
A – Highly developed
B – Developed
C – Less developed
D – Backward
D+ – Most backward
No-Industry Districts – (Hingoli, Gadchiroli)
Naxal-Affected Areas – (Gadchiroli, Chandrapur, Gondia, Yavatmal etc.)
Best subsidy regions for CBG Plants:
⭐⭐⭐⭐⭐ 100% Subsidy Zones
Gadchiroli
Hingoli
Washim (Aspirational)
Nandurbar (Aspirational)
Chandrapur (Naxal)
Yavatmal (Naxal)
⭐⭐⭐⭐ 80% Subsidy Zones
Vidarbha
Marathwada
Ratnagiri
Sindhudurg
Dhule
⭐⭐⭐ 50–60% Subsidy Zones
D & D+ regions across major districts
This location advantage makes your CBG plant financially far more viable.
4️⃣ Subsidy Structure for CBG Plants Under MSME Category
MSME is the most attractive category for CBG plants.
4.1 Industrial Promotion Subsidy (IPS)
✔ 100% SGST Refund on sales within Maharashtra
✔ Claimed annually
✔ Adjusted against eligible FCI
4.2 Interest Subsidy
✔ Up to 5%
✔ Limited to the annual electricity bill amount
4.3 Electricity Duty Exemption
✔ Available in C, D, D+, No-Industry, Aspirational & Naxal areas
✔ For entire eligibility period
4.4 Stamp Duty Exemption
✔ 100% in C, D, D+, No-Industry, Naxal, Aspirational
✔ On land purchase, lease, and loan documentation
4.5 Power Tariff Subsidy
₹1 per unit in backward / special regions
₹0.50 per unit in other areas
For 3 years
4.6 Extra 20% Subsidy for CBG Plants (Thrust Sector Benefit)
Because CBG Plant = Green Energy sector.
✔ 20% extra subsidy on top of normal limits
✔ +2 years extra eligibility
Maximum subsidy cannot exceed 100% of FCI.
5️⃣ Subsidy for Large Scale CBG Plants (LSI / Special LSI)
Industrial Promotion Subsidy
50% of SGST for LSI
40% of SGST (Net) for Special LSI
Basket of incentives
Depending on taluka category: 25% – 100% of FCI
Locations with maximum subsidy:
Vidarbha
Marathwada
Ratnagiri
Sindhudurg
Dhule
No-Industry districts
Naxal areas
6️⃣ Mega & Ultra-Mega CBG Plant Subsidy
For large CBG projects (₹200 crore to ₹4000+ crore):
✔ Customizable subsidy package
✔ Extended eligibility
✔ Stamp Duty & Electricity Duty exemption
✔ SGST-linked subsidies
✔ Flexibility based on investment/employment
Approved by:
High Power Committee (HPC)
Cabinet Sub Committee
7️⃣ Maximum Subsidy Limits for CBG Plants (MSME)
| Location | Max Subsidy of FCI | Eligibility Period |
|---|---|---|
| C | 30% | 7 years |
| D | 40% | 10 years |
| D+ | 50% | 10 years |
| Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Dhule | 80% | 10 years |
| No-Industry / Naxal / Aspirational | 100% | 10 years |
| + Extra for CBG Plants | +20% | +2 yrs |
💡 Example:
If your CBG Plant is in D+ area → 50% + 20% = 70% subsidy
If in No-Industry District → Direct 100% subsidy
8️⃣ Eligible Fixed Capital Investment (FCI) for CBG Plants
Allowed:
✔ Land cost
✔ Civil construction
✔ Digester tanks, pipelines
✔ Biogas purification systems
✔ Compressors, bottling units
✔ CBG storage cylinders
✔ Weighbridge
✔ Testing & R&D facilities
✔ Machinery installation
✔ Pre-operative expenses (up to 10%)
✔ Know-how & technology fees (up to 10%)
Not Allowed:
❌ Vehicles
❌ Solar captive plants (for incentives)
9️⃣ Process to Apply for CBG Plant Subsidy (Step-by-Step)
Step 1 – Before Construction
Land possession
MPCB Consent to Establish
IEM/Udyam Registration
DPR for CBG Plant
Apply to Implementing Agency (DIC/JDI/Directorate)
Step 2 – After Commissioning
First sale bill
MPCB Consent to Operate
Apply for Eligibility Certificate (EC)
Step 3 – Annual Subsidy Claim
SGST paid proof
Electricity duty / bills
Bank interest certificate
Audited balance sheet
Production & sales data
Subsidy is disbursed year-on-year based on eligibility.
🔟 Best Locations to Set Up a CBG Plant in Maharashtra
Based on Subsidy + Feedstock Availability:
⭐⭐⭐⭐⭐ Top Recommended
Gadchiroli (100%) – forest biomass
Chandrapur (100%) – agriculture + biomass
Yavatmal (100%) – cattle dung + crop waste
Hingoli (100%) – sugarcane + paddy waste
Washim (100%) – paddy + agri waste
Nandurbar (100%) – tribal/agri economy
⭐⭐⭐⭐ Highly Profitable
Ratnagiri
Sindhudurg
Dhule
Buldhana
Beed
Osmanabad
These regions give maximum subsidy + abundant biomass/feedstock.
Conclusion: Why You Must Set Up a CBG Plant Under PSI-2019
Setting up a CBG Plant in Maharashtra under PSI-2019 gives you:
✔ Up to 100% capital subsidy
✔ 20% additional benefit (Thrust Sector)
✔ SGST Refund
✔ Stamp Duty exemption
✔ Electricity Duty exemption
✔ Interest & Power Tariff Subsidies
✔ Strong agricultural & biomass ecosystem
✔ Reduced payback period
This is one of the best subsidy frameworks in India for renewable energy entrepreneurs.
Need Expert Help for CBG Plant Subsidy?
Adroit Corporation offers:
✔ DPR for CBG Plants
✔ Bank Loan (Project Finance)
✔ End-to-end PSI-2019 Subsidy Consultancy
✔ CBG Plant Planning & Financial Viability
✔ Annual SGST Claim Filing Support
Contact:
📧 sales@adroitcorporation.in
📞 7203010101
🌐 www.adroitcorporation.in
