Assurena Insurance Agency is an independent insurance brokerage agency that carries some of the best coverage options in the entire New USA.

Our Contacts

88 Centre Street North,
Toronto L4W 1C9
advisor@assurena.com admin@assurena.com
+1 (419)-507-0468
+1 (213)-345-0468

Working Hours

Monday
9.00 - 5.00
Tuesday
8.00 - 5.00
Wednesday
8.00 - 5.00
Thursday
8.00 - 5.00
Friday
8.00 - 4.00
Satureday
Closed
Sunday
Closed

100 KLPD Ethanol Production Plant – Bankable DPR and Sample Project Report for Investors & Financial Institutions

Original price was: ₹10,999.00.Current price is: ₹4,999.00.

A professionally prepared Sample Project Report for a 100 KLPD Ethanol Production Plant, designed for bank appraisal, investor evaluation, and strategic project understanding. Ideal for promoters planning large-scale ethanol projects.

The Sample Project Report for a 100 KLPD Ethanol Production Plant is a comprehensive, professionally structured document prepared on the lines of a bankable Detailed Project Report (DPR). This report is ideal for entrepreneurs, investors, financial institutions, EPC players, and consultants who are planning or evaluating a large-scale ethanol manufacturing project in India.

This sample DPR provides a clear understanding of project feasibility, financial viability, capital requirements, operating costs, revenue projections, and returns, making it a powerful reference document for decision-making, investor presentations, and preliminary discussions with banks and government authorities.

The report covers the complete project lifecycle, including plant capacity, production process, raw material requirements (grain / maize / sugar-based), utilities, manpower planning, cost of project, means of finance, profitability analysis, IRR, DSCR, and payback period. It is structured to meet the expectations of banks, NBFCs, and financial institutions, while also helping investors understand the economics of a 100 KLPD ethanol plant.

🔍 What This Sample Project Report Helps You With:

  • Understanding investment size & capital structure for a 100 KLPD ethanol plant

  • Evaluating financial feasibility, profitability & risk

  • Preparing for bank finance discussions & investor pitching

  • Benchmarking your own project before appointing consultants

  • Saving time in initial project planning and concept validation

📑 Key Inclusions in the Sample DPR:

  • Project overview & capacity details (100 KLPD)

  • Manufacturing process & technology flow

  • Raw material requirement & sourcing overview

  • Utilities: power, water, steam & fuel

  • Manpower & organizational structure

  • Detailed cost of project & means of finance

  • Projected Profit & Loss, Cash Flow & Balance Sheet

  • Financial indicators: IRR, DSCR, Payback Period

  • Risk analysis & implementation timeline

⚠️ Disclaimer:
This is a sample project report meant for reference, learning, and preliminary assessment. Actual project parameters may vary based on location, feedstock, technology, policy benefits, and market conditions. For funding or execution, a customized DPR is recommended.

You may also like…